14  Case Study                                                                               Compass Construction





 King George’s Cottage


 Step-by-Step




                                                          Testimonial



                                                                …They are excellent with a very professional but easy to get on
 03                     05                               with attitude and an eye for detail and quality. We did an almost
                                                         full knockdown then rebuild of a brick and stone house in the heart
                                                         of the Surrey Hills and they did a beautiful job; on time, on budget
                                                         and not one argument or problem that was not immediately sorted.
                                                         The contract was run on a target cost plan and cost plus basis


                                                         professional QS by training so they are right on top of the numbers
                      Boreholing for Ground
                       Source Heat Pumps                 which I can highly recommend as an approach. Richard Taylor is a
                                                         while his co-director Steve Cadman is on top of site works and
                                                         programming. I cannot recommend them highly enough.
 Demolition of
 existing building
                                                          www.yeatesdesign.co.uk









 01




 04                                                                                 07



 Outline drawing for the proposed
 oak framed replacement                       06
 to the conservatory

 On-site progress                                                                  Work in progress –
 meeting with our client                                                         exterior almost complete

 02                                            Installation of internal


                                                  main stair case








 Original building
 and conservatory